There has been a church on the site since around 1008 so it's not surprising that St Mary's needs constant maintenance and repair. Since its formation in 1998, and in addition to other major projects, The Friends have also been involved with:

  1. Taking out the old heating boiler
  2. Removing the old gas supply
  3. Addressing important health and safety requirements
  4. Re-decorating the Church and re-plastering
  5. Oak flooring in the Sanctuary
  6. Electrical work and checks
  7. New lighting in the Nave and Aisles
  8. Repair and repainting of guttering and soffits
  9. Water heaters for kitchen and disabled toilet
  10. Roof repairs and inspections
  11. Repairs to the Tower
  12. A new heating system
  13. Three-phase electrical installation
Window frames before repair in 2014.

Window frames before repair in 2014.

Replaced glass at the rear of the church.

Replaced glass at the rear of the church.

Cycle security.

Cycle security.

Gutter painting.

Gutter painting.

Return to the top of the page